Hotel, Sport & Leisure Tue, Mar 22, 2016 5:28 PM
Balfour Beatty Ground Engineering (BBGE) has commenced piling works for the new O2 Arora Hotel in Greenwich.
The 1800 piles for the hotel are made of precast concrete and have been manufactured at the BBGE plant in Nottinghamshire to high levels of sustainability, containing 99% recycled steel and 25% cement replacement using 100% recycled water.
The piling marks the beginning of a construction programme that will be completed in two years.
Featured News
Specifying shower and wetroom drainage in hotel, gym and leisure facilities requires...
This content is a sponsored publication provided by Compass Pools, an award-winning...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
SCHOTT UK Ltd- Certi...
By SCHOTT UK Ltd.
SCHOTT PYRANOVA® for...
By SCHOTT UK Ltd.
Scott Glass Brochure
By SCHOTT UK Ltd.
SentryGlas® Interlay...
By Firman Glass Ltd
Toughened Glass Bend...
By Firman Glass Ltd
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Fire-resistant glass with the EI classification provides additional thermal insulation alongside...
For fire resistance and protection of people and propertySchott TGS Pyran® SFire Resistant...
ISO PYRAN® S incorporates PYRAN® S fire-resistant glass in a double-glazed unit. This offers a...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...
Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...
This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...