Hotel, Sport & Leisure Tue, Mar 22, 2016 5:34 PM
The John Lewis Partnership has shown its commitment to wood heating by installing a Euroheat biomass boiler at a new build spa and wellness centre in Snowdonia on the banks of Bala Lake, built specifically as a haven for John Lewis staff to take holidays and short-breaks.
The HDG Compact 50kW wood chip boiler now provides heat and hot water for the spa's swimming pool and underfloor heating systems, alongside the 1500 litre buffer tank FRA delivery system.
The building is eligible to receive £5,500 per year thanks to non-domestic Renewable Heat Incentive (RHI) payments and is estimated to be saving some 27 tonnes in CO2 when compared to an oil system.
The biomass system will use approximately 26 tonnes of G30 wood chip, which is sourced from local woodland already owned by the John Lewis Partnership, helping to make the building as sustainable as possible; something the business was very keen on.
The HDG Compact boiler itself features a vertical heat exchanger, which combined with its automatic cleaning system, helps to maintain very high efficiency and only requires annual maintenance. It is designed to burn woodchips, pellets and shavings and is delivered completely assembled. Remote maintenance and SMS control functions are also available.
Renewables installation firm, Menai Heating of Anglesey, North Wales, took on the project. Owner Lee Maher, explained: "We had previously worked with the timber frame company who took on the complete build and, as a result, we were asked to quote for the biomass install. We worked closely with Euroheat on the design and installation and, because everything was built as specified, the installation ran very smoothly.
"It was only our second wood chip installation and the HDG Compact boiler is very installer-friendly and problem-free, which helped us a lot."
The two-storey site, which incorporates a swimming pool, therapy rooms, gym, games rooms and multi-activity space, also includes a water harvesting system to process waste water from the complex due to the location of the hotel. The building has been constructed to BREEAM Excellent, with timber frame walls which have been highly insulated using sheep's wool, as well as sporting locally sourced external cladding.
Featured News
A disused church hall on the Helmingham Hall Estate in Suffolk has been transformed...
Beverley Holidays completes refurbishment of its restaurant with two dumbwaiters from...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Mada ProGuard Brochu...
By Magply
ACD Range Overview
By Hochiki Europe (UK)...
ESP Range Overview
By Hochiki Europe (UK)...
FIREscape+ Range Ov...
By Hochiki Europe (UK)...
Master Catalogue
By F.H. Brundle
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Woodura flooring Planks and Woodura Herringbone from Bjelin are redefining what architects and...
Lightweight fibreglass-reinforced cement board, designed to be applied both on the inside and...
Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...
Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...
This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...