Latest News Mon, Mar 19, 2018 10:13 AM

Leighton Hospital, part of Mid Cheshire Hospitals NHS Foundation Trust (MCHFT), had faced problems and delays when renovating multiple floors in key areas within the hospital. When MCHFT were funded £25.2 million for a new Critical Care and Theatre rebuild it was important that the project was completed on time, within budget and without any problems. The new facility aims to help the Trust with the expected rise in demand for Critical Care and Theatre services over the coming years, so it was crucial that the new flooring remained durable for the foreseeable future.
After utilising UZIN’s support to help rectify a long standing issue with a failing floor, MCHFT worked with UZIN and the flooring contractor iFloor Ltd to specify suitable systems for the new building as well as many other refurbishment projects. Each of which had their own requirements and challenges. By working in partnership with UZIN the Trust were able to install over 15,000 m2 of flooring without any of the previous problems it had experienced. The new flooring is very robust and helps withstand the heavy footfall and traffic load.
The new facility has enabled MCHFT to further improve the quality and safety of patient care. The building has replaced the existing Theatres, along with the existing Intensive Care and High Dependency units, with state-of-the-art services. Due to the success of the projects, MCHFT has continued to work with UZIN for the subfloor on all further flooring refurbishments. In recent years UZIN systems have been used to install new subfloors in the following refurbished areas: the Treatment Centre, Outpatients’ Entrance, Main Entrance numerous Wards, MRI unit and the former Sexual Health Clinic. Paul Swindells, Senior Capital Project Manager, Estates & Facilities Division at MCHFT said “The new flooring has helped breathe new life into the facilities which have been refurbished. The finish and look of the flooring materials are first class and I can testify to their durability.” For more information please visit www.uzin.co.uk
Featured News
Sheffield Housing Company (SHC) is working on planning applications for 133 new homes...
Glidevale Protect has developed a comprehensive new CPD to address the importance of...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Flooring Collection...
By Gerflor
Housing Brochure
By Gerflor
CSR Report 2025
By Gerflor
Thomas Company Broch...
By Thomas Panels and Pr...
SCHOTT UK Ltd- Certi...
By SCHOTT UK Ltd.
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Skytech Pro XL is an A2-s1, d0 fire rated construction membrane that is insulating and vapour...
Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...
Safeshield INT Reflect AVCL is a high-performance air and vapour control layer that boasts class...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...
Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...
This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...