Target missed to make thousands of Grenfell-style cladding homes safe

Latest News Wed, Sep 16, 2020 9:03 AM

Three years after the Grenfell Tower disaster in which 72 people lost their lives, only a third (155 out of 455) of high-rise buildings with Grenfell-style flammable cladding due to be fixed by now have had their cladding replaced with a safe alternative.

In a new report, the Public Accounts Committee says it is “imperative” that the new deadline, for works on the remaining high-rise blocks to be completed by the end of 2021, be met. The Government has no convincing plan for how it will meet that new deadline though, and even if it does there are a host of other serious shortcomings exposed by the Grenfell disaster that also need to be addressed.

The Ministry for Housing, Communities and Local Government accepts that the British system of building safety regulation has been “not fit for purpose” for many years - and these failings have left a legacy of problems for the Department to address which extend far beyond the immediate need to remove dangerous cladding.

A lack of skills, capacity, and access to insurance is hampering efforts to improve or simply assure the structural safety of apartment blocks. This knocks on to any ability to restore the confidence of buyers and mortgage lenders in sales of flats across the country. Leaseholders are in limbo and facing huge bills because of a system-wide failure.

In March 2020 the Department announced that a further £1 billion would be made available to fund the replacement of other forms of dangerous cladding on high-rise buildings – but even by its own estimates, this will meet only around a third of the total costs.

Otherwise, the Government has no plans to support residents or social landlords to meet the costs of replacing dangerous cladding in buildings below 18 metres, of providing ‘waking watches’, or of fixing other serious defects brought to light by post-Grenfell inspections.

Although the Department also recognises that care homes would be at additional risk due to the difficulties in evacuating residents in the event of a fire, it has no knowledge of whether any of the 40,000 care homes, sheltered housing and hospitals below 18 metres in height are clad with unsafe material.

Meg Hillier MP, Chair of the Public Accounts Committee, said: “Thousands of people have been condemned to lives of stress and fear in unsaleable homes with life-changing bills: for the works and for the fire-watch that is necessary to allow them to sleep at night until it is done.

“The government has repeatedly made what turn out to be pie-in-the-sky promises – and then failed to plan, resource, or deliver. The deadly legacy of a shoddy buildings regulation system has been devastating for the victims and survivors of Grenfell but is leaving a long tail of misery and uncertainty for those whose lives are in limbo.

“The Government must step up and show that it will put a stop to the bickering over who is responsible, who’s going to pay for the remediation – and just put this right.”

Featured News

Specification news
Industry safety group calls for greater engagement...

The Industry Safety Steering Group (ISSG) has released its fifth update and urged...

Read More >>

Specification news
University of Edinburgh unveils flagship engineering...

The University of Edinburgh’s new Engineering Forum is now complete, creating a...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Mada ProGuard Brochure Brochure

Mada ProGuard Brochu...
By Magply

Download Now >>

 FIREscape+ Range Overview Brochure

FIREscape+ Range Ov...
By Hochiki Europe (UK)...

Download Now >>

Master Catalogue Brochure

Master Catalogue
By F.H. Brundle

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Woodura® by Bjelin: Real Wood, Reimagined for Specification
Woodura® by Bjelin: Real Wood, Reimagined for Specification

Woodura flooring Planks and Woodura Herringbone from Bjelin are redefining what architects and...

Read More >>

GYPSOTECH® EXTERNA LIGHT Cement board
GYPSOTECH® EXTERNA LIGHT Cement board

Lightweight fibreglass-reinforced cement board, designed to be applied both on the inside and...

Read More >>

Cedral Birkdale
Cedral Birkdale

Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>