FPA welcomes transparency in fire safety reporting

Latest News Wed, Apr 28, 2021 5:58 AM

The government has published its second quarterly update on progress to meet the Grenfell Tower Inquiry recommendations, highlighting the breadth of work taking place.

In a useful development, the government is now providing thematic updates of the work taking place by government, the London Fire Brigade, the National Fire Chiefs Council and other bodies to respond to the 46 recommendations made by Sir Martin Moore-Bick in his Phase 1 report.

Key changes in this quarter include:

  • Progress of the Fire Safety Bill through Parliament to include the front doors of flats and external wall systems within the scope of the Fire Safety Order
  • Publication of the Fire Safety consultation response, which set out other changes to the Fire Safety Order, highlighted the continued high levels of automatic fire alarms and the relationship between fire and rescue services and building control
  • The launch of the Fire Broadcast Talkgroup which means that if a fire and rescue service becomes overwhelmed with emergency calls, the affected service can now make an announcement on their control room Airwave Radio and it will be received in every control room across the county simultaneously.

The quarterly update provides progress against every recommendation, indicating where government has worked with other organisations to make progress.

There are notable updates on work related to evacuation.

The Inquiry recommended that the Government develop national guidelines for carrying out partial or total evacuations of high-rise residential buildings. A government led steering group commissioned an evidence review of methods of evacuation is being finalised before publication.

Successful suppliers have been appointed for the building design, human behaviour and evacuation operational research strands.

The update confirms that the government will seek further views on the complex issue of personal emergency evacuation plans. The details of this are currently being decided and the update states that the government aims to launch a consultation focused on Personal Emergency Evacuation Plans in spring 2021.

Jim Glockling, Technical Director of the FPA welcomed the report. He said: “It is really encouraging to see the government reporting in such a transparent way. It’s so important that everyone in the fire sector as well as the general public can have access to work that is going on in government and other agencies.

“We know that the Grenfell Tower fire brought into stark relief the weaknesses in fire safety in the built environment and the FPA continues to work with government and other stakeholders to bring about the improvements that are so desperately needed.”

Featured News

Specification news
Kier awarded £54m Manchester Airport station...

Kier, a leading UK infrastructure and construction group, has been awarded a £54m...

Read More >>

Specification news
Think Timber launches industry-first data platform to...

Think Timber, strategic partner to the UK timber staircase sector, has launched a new...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Scandinavian Furniture Thoughtfully Made  Brochure

Scandinavian Furnitu...
By BJELIN

Download Now >>

Fire Rated Loft Ladders  Brochure

Fire Rated Loft Ladd...
By Premier Loft Ladders...

Download Now >>

Flooring Collection 2026 Brochure

Flooring Collection...
By Gerflor

Download Now >>

Housing Brochure Brochure

Housing Brochure
By Gerflor

Download Now >>

CSR Report 2025 Brochure

CSR Report 2025
By Gerflor

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Skytech PRO XL
Skytech PRO XL

Skytech Pro XL is an A2-s1, d0 fire rated construction membrane that is insulating and vapour...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

Safeshield INT Reflect AVCL
Safeshield INT Reflect AVCL

Safeshield INT Reflect AVCL is a high-performance air and vapour control layer that boasts class...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>