Latest News Tue, Oct 24, 2023 6:28 AM
Construction is now under way on the comprehensive refurbishment of the Grade II listed Adelaide House in the City of London.
Originally completed in 1924 on the site of the original London Bridge, Adelaide House was the City of London’s first steel frame building.
At the time of construction, it was also considered the tallest building in the City.

Photo: Scott Brownrigg
Designed by Scott Brownrigg for St Martins Property Investments, the refurbishment will enhance and celebrate the existing structure of the building, whilst improving accessibility and weaving in contemporary services and facilities as required by tenants today.
New interventions and materials pay homage to the building's historic elements, whilst referencing the modern context. Staff and visitors will have access to high quality amenities onsite which include a new business lounge within the reception area on the ground floor.
The roof top, originally a rose garden and putting green for building occupiers, will once again be accessible to tenants as it is converted into a communal terrace with extensive views over the River Thames.
The BREEAM Excellent design will provide double the number of cycle parking spaces and changing facilities than currently recommended by the British Council of Offices, facilitating a greener commute to work.
With Galliford Try appointed as the Main Contractor, the building us expected to be complete in early 2025.
Featured News
Wet rooms have become a standout feature of new-build residential and mixed-use...
Grant Westfield, the company behind leading wall panel brands Multipanel and...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
2026 Product Brochur...
By The Radiator Compan...
System for Laying Fl...
By FassaFloor
Training for Excelle...
By Aico
The Connected Home S...
By Aico
Safety First, Aico F...
By Aico
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Partition wall systems made of glass allow transparent room partition. They open, divide and...
Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...
Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...