Mace completes new AstraZeneca facility ‘The Hub’ to support life sciences community in Cambridge

Latest News Fri, Oct 4, 2024 6:03 AM

Mace, the global consultancy and construction company, has completed its latest project for AstraZeneca on the world-famous Cambridge Biomedical Campus.

Providing valuable facilities and services to both employees and the public, The Hub is set to become a new centre for health, wellbeing and support services that aims to enhance the lives of the campus community, contributing to a more productive and healthy work environment.

The building was handed over at an official ceremony with Rob Bridges, Project Director at Mace Construct, Andrew Smith, Executive Director - Special Projects, AstraZeneca and Caroline Durkin, Head of Cambridge Operations, AstraZeneca present.

With an internal floor area of 3,666m2, the project includes a comprehensive environment designed for relaxation and reflection, incorporating a café, bar, shop, fitness centre, treatment rooms, health screening and occupational health services, a nursery and preschool, and a garden.

The Hub was constructed using an exoskeleton concrete frame, inverted roof and a combination of Accoya timber cladding and curtain walling for the façade.

Embracing sustainability from its conception, the new Hub facility is targeting a BREEAM Outstanding rating. Notably, the project saved 5 tonnes of CO₂ through the reuse of excavated soil and incorporates 260 photovoltaic panels to enhance energy efficiency.

Standout features also include a box-in-box system for acoustic separation in the studios and sprung floors for optimal auditory performance, and by leveraging learnings from decades of delivering complex projects across the globe, all of AstraZeneca’s specifications were met in a short timeframe.

Robert Lemming, Managing Director, Public Sector and Life Sciences, Mace Construct said: “The Cambridge Biomedical Campus is a centre for the UK’s and Europe’s flourishing life science industries, making a significant contribution to research and development.

“Supporting all the people that contribute to the Campus community and beyond to thrive and perform their vital roles, AstraZeneca’s newest building ‘The Hub’ will provide important services for their health, wellbeing and productivity.”

The completion of The Hub follows Mace’s successful delivery of AstraZeneca’s Discovery Centre. A state-of-the-art global research and development facility located in the heart of the Campus. Designed to the world’s highest environmental standards, it accommodates over 2,200 research scientists and features the most advanced robotics, high-throughput screening and AI-driven technology.

The Cambridge Biomedical Campus is the largest employment site in Cambridge, with a 17,500-strong community of healthcare professionals and research scientists. It provides world-class biomedical research, patient care and education on a single site.

Featured News

Specification news
Delta Shortlisted Twice in the PCA Best Practice Awards...

Delta Membrane Systems Limited is delighted to announce that, for the third...

Read More >>

Specification news
Housebuilding falls sharply as Glenigan warns...

According to the latest Glenigan Index data, which tracks construction starts under...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Mada ProGuard Brochure Brochure

Mada ProGuard Brochu...
By Magply

Download Now >>

 FIREscape+ Range Overview Brochure

FIREscape+ Range Ov...
By Hochiki Europe (UK)...

Download Now >>

Master Catalogue Brochure

Master Catalogue
By F.H. Brundle

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Woodura® by Bjelin: Real Wood, Reimagined for Specification
Woodura® by Bjelin: Real Wood, Reimagined for Specification

Woodura flooring Planks and Woodura Herringbone from Bjelin are redefining what architects and...

Read More >>

GYPSOTECH® EXTERNA LIGHT Cement board
GYPSOTECH® EXTERNA LIGHT Cement board

Lightweight fibreglass-reinforced cement board, designed to be applied both on the inside and...

Read More >>

Cedral Birkdale
Cedral Birkdale

Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>