The Building Safety Regulator (BSR) has released its latest building control Gateway 2 update.

It demonstrates a continuing positive momentum against a backdrop of increasing decisions, improvements from its pilot batching process for applications and a focus on existing remediation projects.

Highlights to 29 March 2026

  • Across all categories, 284 Gateway 2 decisions were made by the Building Safety Regulator (BSR) in the 12-weeks to 29 March, with a 67% approval rate.
  • New applications representing 12,975 residential units were received and applications representing 16,721 units have been determined, of which 10,165 (61%) were approvals.
  • 61% of decisions (19 out of 31) made by the Innovation Unit (IU) in the last 12 weeks were approvals. This means the 12-week rolling approval rate (less invalidations and withdrawals) is significantly up from last month, with a median approval time of 22 weeks.
  • 62% of all decisions across all Gateway 2 categories related to London cases.
  • In the last 12 weeks, 92 remediation decisions were made (49 in London) with an overall approval rate of 61%. This compares to only 228 decisions made throughout 2025.
  • The batching process is outperforming the previous MDT model, delivering initial assessments in support of decisions in a median time of just 4 weeks.
  • Legacy cases have reduced to 2, with 13 long-term cases with significant technical challenges now transferred to a complex case category.

The update demonstrates a continuing positive momentum against a backdrop of increasing decisions, improvements from its pilot batching process for applications and a focus on existing remediation projects.

Charlie Pugsley, Acting Chief Executive Officer of the Building Safety Regulator, said: “We continue to see improvements to numbers of approvals for new build and remediation cases and the time taken to get to a decision.

“The data we have published today reinforces the significant improvements we have seen when you look at where we were in July 2025, with median decision times of 51.5 weeks.

“A big part of our work to drive improvements is now focused on improving technical consistency in the sector and ensuring that learning from challenging designs or applications is shared. So, we have less complex cases to work through, further reducing decision times. This is directly increasing the availability of thousands of safe new and existing homes across England.

“To manage applications – particularly the intense demand we are seeing in London, which accounts for six in ten of our Gateway 2 decisions – our batching pilot is proving highly effective. By collaborating with specialised external engineering suppliers, we are significantly accelerating processing times, while maintaining our rigorous regulatory oversight.

“However, we recognise the need to push further on existing buildings. That is why our remediation improvement plan provides targeted measures to bolster our resources and support industry in submitting higher-quality applications.

“Speed can never come at the cost of safety. Our goal continues to be to ensure industry can construct safe buildings and that residents see the essential safety improvements they deserve.”

Featured News

Specification news
BRE announces BREEAM Awards 2026 winners

BRE has revealed this year’s BREEAM Awards winners, recognising sustainable...

Read More >>

Specification news
Fully tested, inside to out and outside to in

GypLyner Xternal is fully tested to BS EN 1364-1 as a complete through-the-wall...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Flooring Collection 2026 Brochure

Flooring Collection...
By Gerflor

Download Now >>

Housing Brochure Brochure

Housing Brochure
By Gerflor

Download Now >>

CSR Report 2025 Brochure

CSR Report 2025
By Gerflor

Download Now >>

Thomas Company Brochure Brochure

Thomas Company Broch...
By Thomas Panels and Pr...

Download Now >>

SCHOTT UK Ltd- Certificate of Approval Brochure

SCHOTT UK Ltd- Certi...
By SCHOTT UK Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Purlins & Sections
Purlins & Sections

Purlins & Sections for every projectOur range of cold rolled purlins and structural sections...

Read More >>

Composite Systems
Composite Systems

Our composite systems combine an external sheet, insulation core and internal liner in a single...

Read More >>

TPP 1000-32 Reverse
TPP 1000-32 Reverse

TECHNICAL: LOADSPAN TABLES AND DIMENSIONSOur profiled sheet load/span tables provide guidance on the...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>