Oak Wards healthcare facility opens its doors to Milton Keynes

Latest News Wed, May 27, 2026 4:58 AM

Morgan Sindall Construction’s Northern Home Counties business has completed the Oak Wards healthcare facility in Milton Keynes on behalf of Milton Keynes University Hospital (MKUH) NHS Foundation Trust, marking a significant boost to local healthcare capacity.

To celebrate the final milestone, representatives from Morgan Sindall, Deputy Mayor of Milton Keynes, and Councillor Paul Trendall attended on behalf of the Council. MKUH staff gathered on 11 May to cut the ribbon, hear speeches, and tour the new facility.

Delivered through Pagabo’s Major Works Framework, the Oak Wards expansion provides two new 24-bed wards. Each ward features four five-bed bays and four single bedrooms, alongside essential support spaces including utility rooms, offices, a ward kitchen, and staff facilities.

Designed across two storeys, the wards follow a simple rectangular layout centred around a nurse’s station, with large windows maximising natural light.

In line with Morgan Sindall’s commitment to sustainability, the new Oak Wards facility is heated by roof-mounted air source heat pumps, while the building’s façade, services, and insulation exceed current energy efficiency and thermal performance standards. In addition, a concrete frame was selected over steel to reduce embodied carbon.

At ground level, sustainable drainage systems, including swales and a rain garden, manages rainwater naturally. Plus, Morgan Sindall’s landscaping works will aim to achieve a 10% biodiversity net gain through the planting of trees and wildflowers.

With the site located close to key hospital buildings, construction activities were carefully coordinated to minimise disruption to daily operations, particularly during the creation of a link adjacent to the hospital’s busy Emergency Department.

As part of Morgan Sindall’s 10 Tonne Carbon Challenge, the project team worked collaboratively to reduce construction-related emissions, achieving a saving of 45 tonnes of CO₂e. This was delivered through design changes including switching from piled to pad foundations, reducing concrete use by more than 50%, and adopting a reinforced concrete frame in place of steel, cutting overall carbon emissions by 60%. The use of 35% Ground Granulated Blast-furnace Slag (GGBS) concrete further enhanced the project’s sustainability credentials.

Emma Curtis, Area Director for Morgan Sindall Construction in the Northern Home Counties, said: “It’s great to see Oak Wards now open and making a real difference for the hospital and local community here in Milton Keynes. We’ve worked closely with MKUH throughout the project to expand capacity and create a space that supports the way staff works day-to-day. Just as importantly, we’ve been able to deliver it in a more sustainable way and keep disruption to a minimum while the hospital continued its vital work.”

Joe Harrison, Chief Executive at MKUH NHS Foundation Trust, said: “The opening of Oak Wards is a major step forward for our hospital and the community we serve. Patients are now benefiting from this new environment which supports their dignity and recovery, and their early feedback has been extremely positive. Our teams are also enjoying the new modern facilities which will help them to deliver the best possible outcomes.

“Oak Wards represents a significant stage in our wider development programme which has seen MKUH invest over £85 million in estate projects during the last year. The new building and its facilities were shaped by local people and our staff, and I am very pleased to see their ideas brought to life today.”

Featured News

Specification news
Government is running out of time to save the BTR...

New research from Real Estate:UK (“RE:UK”), prepared by Savills, has highlighted...

Read More >>

Specification news
Common Assessment Standard updated in line with latest...

Build UK has published an updated version of the Common Assessment Standard, the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

CemGold Brochure

CemGold
By IPP

Download Now >>

Mada ProGuard Brochure

Mada ProGuard
By IPP

Download Now >>

Scandinavian Furniture Thoughtfully Made  Brochure

Scandinavian Furnitu...
By BJELIN

Download Now >>

Fire Rated Loft Ladders  Brochure

Fire Rated Loft Ladd...
By Premier Loft Ladders...

Download Now >>

Flooring Collection 2026 Brochure

Flooring Collection...
By Gerflor

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>