Working with Fabrique Specialist Glazing

Library Fri, Mar 19, 2021 10:59 AM

Grimsby based fabricators Fabrique Specialist Glazing were a vital part of the supply chain in the development of the brand new Holiday Inn Express in Grimsby Town Centre. The brand new hotel development was built to satisfy the bed shortages in this popular town and Fabrique were a perfect choice to complete all the fenestration needs for the new hotel.

The Challenge

The hotel development required a complete glazing solution and the contractors looked for a local fabricator who could install all the glazing requirements throughout the hotel.

The Solution

Fabrique approached their aluminium supplier Kestrel Aluminium Systems to assist them with the project from the outset and the two companies worked in partnership for the entire project, from product specification to delivery.

Kestrel Aluminium quoted the complete job for Fabrique using the in-house V6 estimating software. The estimating package optimises all the material required to ensure minimal material wastage and costs were kept to a minimum, an important aspect of the brief to remain competitive. Each hotel floor was quoted as separate jobs so the material could be ordered in quantities to suit Fabrique’s requirements and the overall building project.

Specifying the 75mm and 100mm Curtain Walling system created a smart and modern solution for glazing the wide openings on the ground floor. This popular and robust system provided a simple solution for Fabrique to install efficiently to make the building watertight. The system is also compatible with our commercial doors which have been fitted throughout the ground floor. Both automatic and manual doors have been installed utilising panic hardware and mag locks that offer security and comply with building regulations.


The project brief included the installation of 80 windows that needed to be thermally efficient and capable of accepting acoustic glazing. The 60mm Window System was the ideal choice offering low U-Values with Fabrique choosing to install 35 and 40 decibel acoustic glazing to ensure all guests of the hotel enjoy a quiet night’s sleep!

Fabrique offered bespoke solutions for the project, drawing on their experience in the fenestration industry they added details to the building that created a high end finish. Steve Hilldrith, Managing Director of Fabrique Specialist Glazing explained “We created a cladding design to mimic the appearance of a bay window adding to the aesthetics of the building and were able to offer our design expertise to help finish the project to the desired specification.”

The Benefits

As Fabrique were on a tight schedule to supply their part of the project they needed to be in constant communication with the Kestrel team to ensure that the material for each floor was delivered on time and in full. A member of the administration team was assigned to the project to offer continuity and a point of contact for all enquiries and progress reports.


Not only has Grimsby acquired a new hotel facility it utilised existing wasteland that was being used as a car park. The redeveloped land now offers employment opportunities for the local area as well as much needed accommodation.

To demonstrate the result of a successful partnership Steve Hilldrith, Managing Director of Fabrique Specialist Glazing met with John Treagust and Nicki Baylis of Kestrel Aluminium Systems at the completed hotel to show case the end result.

“On projects of this size working closely with our customers ensures a successful outcome for all parties. We pride ourselves on providing the support from start to finish and the Holiday Inn completed by Fabrique is a project we are proud to have been a part of” says Business Development Manager John Treagust.

For more information on Fabrique Specialist Glazing visit www.fabriqueglazing.co.uk

Featured News

Specification news
Roofshield - Boleskine House Estate

The world-renowned Roofshield membrane from the A. Proctor Group has been installed...

Read More >>

Specification news
HANDRAILS FOR EDUCATION

DA compliant handrail, sleeved with 4mm thick PVC, OR, stainless Steel handrail. Both...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Vertical radiators complete range Brochure

Vertical radiators c...
By Myson

Download Now >>

Myson Radiant Heating Premium underfloor heating systems Brochure

Myson Radiant Heatin...
By Myson

Download Now >>

Which heat emitter is the right one? Brochure

Which heat emitter i...
By Myson

Download Now >>

Sustainable heating solutions for renovation Brochure

Sustainable heating...
By Myson

Download Now >>

Rearo Tradeline Brochure

Rearo Tradeline
By Rearo

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>

Sustainable Energy Efficient Solutions
Sustainable Energy Efficient Solutions

From radiators and underfloor heating to ceiling convectors and towel warmers, Myson is the UK’s...

Watch Now >>

UNISENZA PLUS Smart Controls_The complete system solution
UNISENZA PLUS Smart Controls_The complete system solution

With Unisenza Plus Smart Controls you can easily monitor and control all linked heating products via...

Watch Now >>