LINK&LOCK feature speeds drainage channel installation

Latest News Tue, Mar 22, 2016 5:22 PM

LINK&LOCK feature speeds drainage channel installation

Hauraton have developed an innovative linking system for their RECYFIX® HICAP® high capacity surface water drainage channels. The new LINK&LOCK feature facilitates the alignment of each one metre channel unit with the next, providing a positive mechanical fix that makes the installation procedure of the whole channel run much easier.

With their ductile iron slotted tops, in a choice of four configurations, the channels have proved very effective at draining large areas of asphalt and concrete. With on-site test installations in early June 2013 now complete, Hauraton are confident contractors will find the new system easier and quicker to install.

Featured News

Specification news
BRE establishes industry network with the aim of making...

BRE has announced the creation of the PV Fire Intelligence Network (PV-FIN) – a...

Read More >>

Specification news
Double Award Win Celebrates excellence in UK structural...

Delta Membrane Systems Limited was honoured with the 'Sustainability' and 'The All...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SignetFire
SignetFire

Why SignetFire?Are you looking for replacement fire doorsets for your latest project?We’re...

Read More >>

Roofing Collections
Roofing Collections

Our carefully curated range of handmade roofing tiles and slates is specifically designed to...

Read More >>

Special Brick Collections
Special Brick Collections

Special-shaped bricks are specifically designed to feature a variety of shapes and dimensions that...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Reclaimed Brick Company Leah's Yard Square Sheffield
Reclaimed Brick Company Leah's Yard Square Sheffield

Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...

Watch Now >>

Day in the life of a Reclamation Yard
Day in the life of a Reclamation Yard

A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...

Watch Now >>

Reclaimed Brick Display at Reclamation Yard
Reclaimed Brick Display at Reclamation Yard

Reclaimed Brick Display at Reclamation Yard

Watch Now >>