Project Focus: Manchester United Football Club, Old Trafford, Manchester

Latest News Tue, Mar 22, 2016 4:59 PM

Project Focus:  Manchester United Football Club, Old Trafford, Manchester

Completion Date: July 2011

Client: Manchester United Football Club
Location: Old Trafford, Manchester
Contractor: Alard Electrical Ltd
Luminaires: TTX, Syncro M, Syncro S1, Syncro S2 and Buddy M

Project requirements

As the football season drew to a close it was time for Old Trafford to commence its renovation projects including the hospitality areas in the West Stand and South East Quadrant. All of which needed to be completed before The Clubs testimonial, which was no mean feat when you consider that the match was only a couple of months away.

Having been previously let down on lead times and service by a key player in the lighting industry, Manchester United FC was, understandably nervous about appointing a new supplier with whom they could rely on to supply all the fittings on time and to budget.

Alard Electrical Ltd, the electrical contractors for the renovation project, had previously worked with Gamma on other projects and so was happy to recommend the company as a reliable partner for the lighting requirements of the renovation.

Project solutions

The renovation of the hospitality area in the West and South East Stand Quadrants was a prestigious project and the selected LED fittings had to help create a luxurious ambience that reflected the high-end surroundings, yet didn’t detract from the other creative and decorative lighting features.

With this in mind the TTX 700 lumen, 3000K with 60° beam and centre etched glass was chosen for the ambient lighting in the corridor areas. This provided the perfect amount of light and offered a quality and aesthetically pleasing fitting for the location.

In addition to the TTX fittings, Syncro M, S1 and S2 LED lights were selected for the adjustable display lighting to highlight the various pictures which adorn the corridor walls as well as above the doorways leading off the corridors. Each of these fittings offered 580 lumen output, 4000K and a selection of 54° and 24° beam angles with a brushed aluminium finish.

For the toilets and hospitality bar area the Buddy M fitting was selected as an excellent low energy alternative to the 50W halogen GU10. The Buddy M provided a cost effective adjustable and lockable gimbal, 40° beam angle and a warm colour temperature of 2700K.

It was at this point that Hannon Associates, Building Services Consultants for the project, were asked to review the fittings supplied by Gamma. After analysis and a range of tests, the fittings were approved for the job.

Project results

As well as creating the desired ambience the LED luminaires will save a substantial amount of time and money over their long life when compared to other light sources. A prime example of this is the Buddy M which consumes only 7W giving a saving of up to 85% when compared to a 50W halogen GU10.

Further savings will be made from the exceptional life of 50,000 hours (L70) offered by the TTX luminaires, during which time there will be low maintenance costs and minimal disruption no-relamping requirements.

To the delight of Manchester United the renovation project was completed on time and without any problems or issues, which meant that the hospitality area was open for business at the start of the testimonial matches.

 

Featured News

Specification news
More than 1,000 new homes delivered through Leeds...

More than 1,000 new homes have been delivered in Leeds through a long-standing...

Read More >>

Specification news
Connect, collaborate, shape the future - registration...

Registrations are now live for UK Construction Week (UKCW) Birmingham, the national...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Mada ProGuard Brochure Brochure

Mada ProGuard Brochu...
By Magply

Download Now >>

 FIREscape+ Range Overview Brochure

FIREscape+ Range Ov...
By Hochiki Europe (UK)...

Download Now >>

Master Catalogue Brochure

Master Catalogue
By F.H. Brundle

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Cedral Birkdale
Cedral Birkdale

Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...

Read More >>

Cedral Thrutone Smooth
Cedral Thrutone Smooth

Cedral - Thrutone Smooth are a low-profile fibre cement slate that features a smooth surface and...

Read More >>

Cedral Rivendale
Cedral Rivendale

Cedral - Rivendale slates are designed to reflect the qualities of natural slate. Available in...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>