Public Sector Tue, Mar 22, 2016 5:06 PM
The creation of a new, iconic development in the heart of Manchester’s vibrant student district has been aided with an innovative double-decked mechanical access solution from Harsco Infrastructure.
Working with main contractor Shepherd Construction Ltd on the prestigious Student Castle project, Harsco designed and supplied a bespoke system using solutions from its range of construction access equipment to provide access to all external elevations, allowing the architectural panels to be easily applied to the 31-storey student accommodation block.
The Student Castle, which towers over Manchester Oxford Road rail station from its Great Marlborough Street location, proved a complex building profile with variations in height, projections and recesses. Harsco’s team proposed the use of mast-climbing work platforms to provide clear, unobstructed access to all areas of the facade, while allowing the transport of materials to the working area to be unimpeded.
Harsco installed a mix of single and double masted platforms in 17 positions around the exterior of the building, with some reaching up to 100m in height. Of the 17 platforms, 6 were ‘double deck’, allowing two different operations to take place simultaneously with two independent platforms on the same mast. Several of the mast-climbing work platforms installed were mounted on roof areas at various points around the structure, requiring carefully engineered load-bearing support structures.
The team innovated further, with the introduction of a unique safety gate system. While most platform access solutions force the user to lower the whole platform to base level to enter and exit the platform, Harsco’s system allowed the team working on the Student Castle to access platforms from the upper floors of the building. As a result, the Shepherd team reported improved efficiency on the job thanks to increased speed of access to the working area.
Cameron Reid, UK Mechanical Access Director at Harsco, said: “We pride ourselves on being able to provide innovative solutions to complex, interesting challenges and feel that we delivered the ideal solution to the Student Castle brief.
The building is a unique design, meaning traditional access installations would have been difficult to use. By working closely with our partners on site and having a wide range of creative solutions open to us, we designed and installed a range of access solutions that proved successful.”
Featured News
To meet Central Government targets to deliver more affordable housing, like many...
Gerflor is excited to unveil the renewed Gradus Lunar carpet tile collection, now...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Pump Technology Prod...
By Pump Technology Ltd
Our product range at...
By Premier Loft Ladders...
Proctor Air
By A Proctor Group Ltd.
Your Specialist Part...
By RMD Profiles Ltd
PVC-U System Fully R...
By Epwin window systems...
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
The Supreme heavy-duty loft ladder is supplied as a ready to fit unit. It is manufactured from high...
The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...
The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Proctor Air® is an air and vapour permeable, highly water resistant roofing underlay. Its...
In this video, we explore how blue roofs are transforming urban landscapes by helping to mitigate...
At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...