Latest News Wed, Mar 23, 2016 9:08 AM
The main production area of the Express Contract Drying factory in South Wales required refurbishment. The existing slabs created significant substrate challenges due to the mixture of old finishes and bare concrete.
TPS360, the contractor for the project, was instructed to produce a new floor finish that needed to be slip resistant with good chemical resistance whilst providing an attractive and highly durable finish.
Remmers Floormix DQ flooring system was chosen for its special blend of decorative colour quartz aggregate and extreme durability which was ideally suited for this application.
Due to time constraints on the program, fast curing resin screeds were installed, to falls, to an exacting standard to avoid ponding.
Featured News
Industry body, The Housing Forum, has raised concerns that the Health and Safety...
The Door & Hardware Federation (DHF) is encouraging hardware members to prepare for a...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Mada ProGuard Brochu...
By Magply
ACD Range Overview
By Hochiki Europe (UK)...
ESP Range Overview
By Hochiki Europe (UK)...
FIREscape+ Range Ov...
By Hochiki Europe (UK)...
Master Catalogue
By F.H. Brundle
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...
Cedral - Thrutone Smooth are a low-profile fibre cement slate that features a smooth surface and...
Cedral - Rivendale slates are designed to reflect the qualities of natural slate. Available in...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...
Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...
This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...