Pedestrian guardrail project for Alpha Rail

Public Sector Wed, Mar 23, 2016 9:07 AM

Pedestrian guardrail project for Alpha Rail

Metal railings and gates specialists Alpha Rail has commenced the supply and installation of pedestrian guardrail for the A453 widening project in Nottingham.

This Highways Agency scheme, worth £150 million, will widen a seven mile stretch of the A453 between M1 Junction 24 and the A52 Nottingham Ring Road – a major link serving Nottingham, the M1 and East Midlands Airport.

Construction work began in January 2013 and the main contractor, Laing O’Rourke has been keen to use local people and contractors. So far over 400 people have been employed on the scheme’s construction, and over £21.5 million has been spent with local businesses on materials and services.

Alpha Rail is one of the local companies to have benefited from the project and so far has supplied over 500 linear meters of Optirail high visibility pedestrian guardrail.

The Optirail pedestrian guardrail system, which is only available from Alpha Rail, is considered the ultimate in high visibility guardrail due to the staggered arrangement of its infill bars.

The initial installation has been supplied for the Crusader Island location which is a busy traffic island and pedestrian crossing point for residents of Clifton and Barton Green and is also an access point for the Crusader Pub.

As the project progresses and tarmac and footpaths are completed, Alpha Rail will be supplying further guardrail.

A 2.5km stretch runs through the urban area of Clifton and is being widened to a four-lane single carriageway.  Other traffic management measures will be put in place to include three further junctions.

The entrance to Nottingham Trent University which has a large student campus along the main route through Clifton is also being reconfigured.

Featured News

Specification news
Forbo expands popular Furniture Linoleum collection to...

Furniture Linoleum is Forbo Flooring Systems’ much-loved, high quality, climate...

Read More >>

Specification news
Winter Ready? Why Smart Operators Plan Their...

As we enjoy the longer days and warmer weather, it’s easy to forget that winter...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Pump Technology Product Range Catalogue Brochure

Pump Technology Prod...
By Pump Technology Ltd

Download Now >>

Our product range at a glance... Brochure

Our product range at...
By Premier Loft Ladders...

Download Now >>

Your Specialist Partner in Composite Steel Roof & Floor Decking Brochure

Your Specialist Part...
By RMD Profiles Ltd

Download Now >>

PVC-U System Fully Reversible Windows by Epwin Window Systems Brochure

PVC-U System Fully R...
By Epwin window systems...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Supreme Heavy-Duty Loft Ladder
Supreme Heavy-Duty Loft Ladder

The Supreme heavy-duty loft ladder is supplied as a ready to fit unit. It is manufactured from high...

Read More >>

Designo Loft Ladder
Designo Loft Ladder

The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...

Read More >>

Elite Loft Ladder
Elite Loft Ladder

The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Proctor Air® Product Explainer
Proctor Air® Product Explainer

Proctor Air® is an air and vapour permeable, highly water resistant roofing underlay. Its...

Watch Now >>

Discover the Power of Blue Roofs in Urban Flood Management
Discover the Power of Blue Roofs in Urban Flood Management

In this video, we explore how blue roofs are transforming urban landscapes by helping to mitigate...

Watch Now >>

RMD Profiles - UK Experts in Metal Decking, Design Installation
RMD Profiles - UK Experts in Metal Decking, Design Installation

At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...

Watch Now >>