All change at St Andrews School

Education Thu, Sep 22, 2016 10:32 AM

AV Danzer has delivered new modular shower and changing room facilities for St. Andrews Primary School in Cobham.

The school approached AV Danzer to design a stand-alone facility which could sit adjacent to its swimming pool which is located at the side of the playing fields. The firm specified a highly cost-effective solution using its OpenSpace product which could also be delivered quickly to meet the school’s tight time frame.

The children had previously had to change in the school building before walking across the playground to join their swimming lesson. The new facility allows them to change and shower immediately next to the swimming pool.

Delivery of the new changing rooms meant that the school could replace its existing facility within the main school building, allowing them to re-utilise this space for other teaching purposes.

In order to site the new building AV Danzer undertook external ground works which included preparing foundations, trenching, re-surfacing and fencing.

The installation was complex because the swimming pool was located to the rear of the main school complex and the approach was along residential roads so the team installed 85 metres of trackway across the grass playing fields and playground which allowed them to rig the 80 tonne crane to lift the 40ft span modules into place.

To minimise disruption to residents AV Danzer undertook a letter drop to all neighbours as well as putting in place temporary parking suspensions. This allowed the articulated lorries to manouver along the network of residential roads and access the site.

School bursar Joy Taylor commented: “Everyone is really very impressed with the new building and the installation work done by AV Danzer and we are already making good use of it.”

Featured News

Specification news
Newcastle University cuts carbon and water use with...

Newcastle University has taken a decisive step towards greater sustainability by...

Read More >>

Specification news
Primary academy chooses solar PV for its new roof...

Intake Primary Academy is one of 14 schools, across three Doncaster constituencies,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Pump Technology Product Range Catalogue Brochure

Pump Technology Prod...
By Pump Technology Ltd

Download Now >>

Our product range at a glance... Brochure

Our product range at...
By Premier Loft Ladders...

Download Now >>

Your Specialist Partner in Composite Steel Roof & Floor Decking Brochure

Your Specialist Part...
By RMD Profiles Ltd

Download Now >>

PVC-U System Fully Reversible Windows by Epwin Window Systems Brochure

PVC-U System Fully R...
By Epwin window systems...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Supreme Heavy-Duty Loft Ladder
Supreme Heavy-Duty Loft Ladder

The Supreme heavy-duty loft ladder is supplied as a ready to fit unit. It is manufactured from high...

Read More >>

Designo Loft Ladder
Designo Loft Ladder

The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...

Read More >>

Elite Loft Ladder
Elite Loft Ladder

The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Proctor Air® Product Explainer
Proctor Air® Product Explainer

Proctor Air® is an air and vapour permeable, highly water resistant roofing underlay. Its...

Watch Now >>

Discover the Power of Blue Roofs in Urban Flood Management
Discover the Power of Blue Roofs in Urban Flood Management

In this video, we explore how blue roofs are transforming urban landscapes by helping to mitigate...

Watch Now >>

RMD Profiles - UK Experts in Metal Decking, Design Installation
RMD Profiles - UK Experts in Metal Decking, Design Installation

At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...

Watch Now >>