Research Identifies Significant Savings with Tapered Roof Insulation

Latest News Wed, Sep 23, 2020 10:39 AM

A new white paper has highlighted that tapered roof insulation systems, which combine flat roof insulation and drainage in a single product, can achieve considerable savings when compared with other common methods for creating a fall on a flat roof. The report shows the tapered insulation systems require no drying time, can be as little as around 3% the weight of screed to fall systems and deliver cost savings of as much as £58 per m2 (43%) on the roof build-up above the deck.

The Flat Roof Drainage white paper from Kingspan Insulation examines three commonly used methods of achieving a fall on a warm deck flat roof:

• screed laid to falls;

• timber firrings under a plywood deck; and

• tapered roof insulation (specifically Kingspan Thermataper Systems)

It features a comparative cost analysis from Currie & Brown, looking at the three approaches across four new build non-residential buildings with concrete decks. These included a hospital extension and office blocks, with roof areas of between 192 m2 and 3,073 m2. All of the constructions use Kingspan Therma range insulation and are designed to achieve identical U-values of 0.16 W/m2K.

The results showed that the Kingspan Thermataper Systems provided the most cost-effective option across all four case studies. The system provided savings of £43 - 58 per m2 (up to 43%) on the roof build-up above deck when compared with screed to falls and £15 - 32 per m2 (up to 23%) when compared with the timber firrings. The analysis concluded that Kingspan Thermataper Systems would also provide cost savings on timber and metal deck roofs when compared with timber firings.

The white paper also highlights that a standard cement: sand screed dries at approximately one month per 25 mm thickness. This means that the drying time can be as much as 195 days or more on larger surfaces – greatly extending project timescales. Whilst this can be reduced with a quick-drying screed, this will raise system costs by between 40-50%.

Weight is also identified as an issue, with standard cement: sand screed weighing around 2000 kg/m3. When applied to the 3,073 m2 case study roof this led to a total above deck system weight of 1,005,000 kg, compared with just 23,000 kg for the Kingspan Thermataper System. This added weight will have clear structural implications for the building foundations and frame along with additional costs beyond those highlighted in the Currie & Brown analysis.

To read more about the research and the benefits tapered roof insulation can provide, download the Flat Roof Drainage white paper – www.kingspaninsulation.co.uk/flatroofdrainage

For further information, please contact:

Tel: +44 (0) 1544 387 384

Fax: +44 (0) 1544 387 484

email: info@kingspaninsulation.co.uk

Website: www.kingspaninsulation.co.uk/flatroofdrainage

www.twitter.com/KingspanIns_UK

www.linkedin.com/company/kingspan-insulation-uk

Featured News

Specification news
Government appoints six members to the Fundamental...

The government has announced the appointment of six members to the Fundamental Review...

Read More >>

Specification news
Mark Farmer joins Future Homes Hub Board to accelerate...

Mark Farmer, a leading voice on construction innovation and sustainable development,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Retirement & Care Brochure

Retirement & Care
By AKW

Download Now >>

Kitchens Brochure

Kitchens
By AKW

Download Now >>

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

RAPIDFIT OFF-THE-SHELF CUBICLES
RAPIDFIT OFF-THE-SHELF CUBICLES

RapidFit range offers a quick and efficient solution for commercial washroom projects that require...

Read More >>

Washroom Cubicles
Washroom Cubicles

Washroom Cubicles to meet all needsRearo offers a range of stylish, functional, and durable washroom...

Read More >>

ParallelRoof 100
ParallelRoof 100

ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>